Generating PDF document

Please, wait a moment

Too much time loading?
Reload the page and try again.

CYTUVA

Castilla y León Electrical Calibration Laboratory (LACECAL)

Download PDF

Contact Information

Basic Information

  • UniversityUniversidad de Valladolid
  • Center
  • DepartmentElectronic Technology
  • Investigation GroupLACECAL


Description

LACECAL was created in 1991 with the aim of promoting the improvement of the technical capacity and technological resources of the region. The laboratory thus develops an activity that provides technical services to industrial companies and other institutions, not only in the region but also at the national and international level. Its objectives include:
  • Provide a calibration service accredited to the industry.
  • Make available to the Community the necessary services in various Legal Metrology Areas (electric energy meters and measurement transformers).
  • Provide an Electromagnetic Compatibility Testing service.
  • In 2000, the LACECAL ASSOCIATION was created by a group of companies and institutions from the autonomous region of Castilla y León, providing their services at the Higher Technical School of Industrial Engineers and at the Scientific Park of the University of Valladolid.
Its main activities in order of chronology are the following:
  • Calibration
  • Legal metrology
  • Electromagnetic compatibility
  • CE marking
  • R&D projects
  • Distance training via internet
  • Electrical safety
  • Photovoltaic tests

Currently, the following official accreditations are available:
  • Accreditation No. ENAC 49 / LC10.028 of the Area of ​​Electricity, Time and Frequency - Year 1995
  • Resolution of the General Directorate of Industry, Energy and Mines authorizing LACECAL to carry out the verification tests of electric meters - Year 1998
  • Resolution of the General Directorate for Industry and Technological Innovation, authorizing the Electrical Calibration Laboratory of Castilla y León (LACECAL), to carry out tests on measurement transformers to control compliance with regulatory provisions - Year 2004.
  • ENAC accreditation nº OC-L / 142 for the State Metrological Control: Marketing and Commissioning Phase for electric energy meters - Year 2009.
  • ENAC Accreditation No. OC-I / 159 to carry out the State Metrological Control: Instruments in service phase - Year 2010.


Other information

Number of researchers:

14

Technological Line(s):

- Laboratories and research centers

Development status:

In research and development phase

Differentiation in the market:

Quality

Applicability of technology:

Yes

UNESCO Code:

3310 - Industrial technology

Photos

Videos

Other resources

Related projects

ENRIDING URBAN TRAIL Mk.2_2

Design of a dual-use (urban and enduro) electric motorcycle with a chassis adapted to the electric engine. From the experience with 2 previous prototypes, LACECAL (Spanish acronym for Electric Calibration Laboratory of Castilla y León) has developed... Read more >

GIR Analysis and Diagnosis of Installations and Electrical Networks (ADIRE)

GENERAL OBJECTIVESElectricity is the type of energy most used today. Due to the effects of global warming and pollution due to the use of other types of energy, electrical energy is undergoing a very important development in all fields. In generation... Read more >

Studies, fault detection, diagnostics and reliability in electrical energy use.

Among the group’s lines are: Integration of renewable energies in Smart Grids and isolated networks.Studies of energy quality and its impact on networks and facilities.Predictive maintenance methods in electric machinesDetection and diagnosis of fa... Read more >

GIR - Electronic Materials and Devices Characterization Group (GCME)

OBJECTIVESThe group of electrical characterization of materials and electronic devices has developed a set of standard techniques based on the analysis of conduction mechanisms and electrical parameters (capacity, conductance, current, etc.), which a... Read more >

This email will be sent to the technology and knowledge transfer office. In your case, it will also be sent to the researcher responsible for the chosen project.
Fields marked with * are mandatory.

I accept the Privacy Policy

CAPTCHA Image

Type the characters shown in the image on the left.

[ Different image ]

close